Solar and storage power plants for Pakistan

Powering Pakistan’s growth with solar.

NOY Energy develops, builds and operates solar and storage plants for industry, towns and public institutions. We invest our own capital, so our partners pay less for power without paying for the plant.

Up to US$ 50 million planned for Pakistan’s first phase: about 50 MWp of solar with battery storage.

From one plant to 40+ projects.

5.0MWp

Operating

Amdjarass

Ennedi-Est, Chad · Operating

Hybrid solar-storage plant powering the town, built in 11 months.

2.8MWp

Operating

Adré

Ouaddaï, Chad · Operating

Solar power plant for the town.

2.5MWp

Operating

Goz-Beïda

Sila, Chad · Operating

Solar power plant for the town.

0.12MWp

Operating

Guéliendeng

Mayo-Kebbi Est, Chad · Operating

Distributed solar for local services.

2.5MWp

Under construction

Solar-storage plant

Eastern Chad · 12 MWh storage · Under construction

Solar generation paired with 12 MWh of battery storage.

275km

World Bank-funded

Lighting and grid

Chad · HV line and street lights · World Bank-funded

20,000 solar street lights and an HV line, delivered in consortium.

One plant

Everything a solar project needs, under one roof: design, financing, construction and long-term operation.

Opened

Open it up and the work comes out in order: site surveys, system design, procurement and the crews who install it.

Released

Panels leave for the field. 10.4 MWp of solar is already commissioned, with 12 MWh of storage on the way.

Delivered

Six of the 40+ projects we have delivered, in 15+ localities. Pakistan is next.

Pakistan, our next market

Solar for Pakistan’s industry and towns.

We bring the same end-to-end approach to industrial zones, project sites and public institutions across Pakistan.

01

Solar parks and hybrid plants

Grid-connected or captive utility-scale plants with battery storage.

02

Captive power for SEZs

Lower, predictable energy costs for industrial zones, with zero-capex options.

03

Off-grid solar and storage

Reliable power for remote project sites, camps and communities.

04

Lighting and grid works

Solar street lighting and transmission line delivery, the same work we carried out on a World Bank-funded project in Chad.

About NOY Energy

Solar power where it is needed most.

We handle each project end to end, from design and financing to construction and long-term operation, often in remote and off-grid locations.

01 / 04

10.4MWp

Solar capacity commissioned

Four operating plants in Chad: Amdjarass, Adré, Goz-Beïda and Guéliendeng.

  • Capabilities
  • Utility-scale and hybrid solar plants
  • Battery storage
  • Off-grid mini-grids
  • Solar street lighting
  • HV transmission lines
Commercial models

One plant, three ways to own it.

Choose the model that suits your balance sheet. Each covers the whole job, from the first survey to long-term operation.

MODEL 01

Turnkey EPC

The client owns the plant from day one.

MODEL 02

Energy as a service

Zero capex. The client pays only for the solar units it uses.

MODEL 03

BOOT

We build, own and operate the plant, then transfer it.

How we deliver

From first survey to long-term operation.

One partner carries each project through four stages, so nothing is lost between the design, the build and the years of operation after it.

Step 01

Assess

Site survey, load and bill analysis. We measure what a site uses and what it pays today, so the plant is sized to the real load.

Step 02

Design and finance

System design and funding structure. We design the plant and set out how it is paid for, including options with no upfront capital.

Step 03

Build

Turnkey EPC delivery and commissioning. One contractor from procurement to switch-on. Amdjarass went from construction start to commissioning in 11 months.

Step 04

Operate

Monitoring, O&M and performance. We monitor and maintain the plant for the long term, so it keeps producing what it was designed to.

Our own capital

We invest in solar to lower the cost of energy.

We put our own capital into solar and storage where power is expensive or unreliable. We finance, build and operate the plants ourselves, so our partners get lower tariffs without the upfront cost.

Figures shown in

Invested to date (approx.)

US$ 22 million

≈ PKR 6.0 billion

Solar PV, 10.4 MWp · US$ 10.4m Battery storage · US$ 4.0m Under construction · US$ 7.3m

Next: Pakistan, indicative first phase

up to US$ 50 million

≈ PKR 13.9 billion over 3 years

  • About 50 MWp of solar with battery storage
  • For industrial zones, industry and public institutions
  • Invested by us, with lower tariffs for the offtaker
Invested to date
Pakistan, first phase

Investment to date is estimated from project capacities at typical installed costs. US$ 1 = PKR 277.

Climate and communities

Cleaner power, and work for the places we build in.

Indicative CO₂ savings from our plants, and the checks we run on every site.

CO₂ avoided per year

Tonnes, indicative

Chad plants today 10.4 MWp · operating

≈ 13,600 t

Pakistan first phase about 50 MWp · planned

≈ 35,000 t

≈ 18 GWhClean electricity a year from our Chad plants
≈ 320,000 tCO₂ avoided by our Chad plants over 25 years

Size a plant for your site

Move the slider to see what a plant in Pakistan could produce in a year.

50 MWp
≈ 77,500 MWhElectricity a year
≈ 34,900 tCO₂ avoided a year

Uses the same assumptions as our Pakistan estimate: 1,550 kWh per kWp a year and a grid factor of 0.45 t CO₂ per MWh.

On every site

  • Local hiring and trainingWe hire and train local people on our sites.
  • Community consultationWe consult communities before construction begins.
  • Environmental assessmentEvery build starts with an assessment of the site.
  • Health and safetyA health and safety programme runs on all our sites.
  • Carbon credits PlannedWe plan to register upcoming plants under a recognised carbon standard.

Indicative estimates, not measured data. Chad: 10.4 MWp × 1,750 kWh/kWp a year, displacing diesel generation at 0.75 t CO₂/MWh. Pakistan: 50 MWp × 1,550 kWh/kWp a year at an assumed grid factor of 0.45 t CO₂/MWh. The 25-year total allows for 0.5% annual module degradation.

On the record

Built, commissioned and still running.

Three pieces of work that show how we deliver: a full plant in under a year, a funded consortium programme, and towns that run on our power.

The NOY Energy team standing in front of the solar arrays at AmdjarassFeatured project · Commissioned

Amdjarass

Ennedi-Est, Chad

A 5.0 MWp hybrid solar-storage plant that powers the town of Amdjarass, built end to end by NOY Energy in 11 months.

Construction starts11 monthsCommissioned
World Bank-funded · In consortium

Lighting and grid

Chad

20,000 solar street lights and 275 km of high-voltage line, delivered as part of a consortium on a World Bank-funded project.

20,000Street lights
275 kmHV line
1Consortium
Power for towns

Towns across Chad

15+ localities

Solar and storage plants powering more than fifteen localities, from 0.12 MWp of distributed solar to a 5.0 MWp hybrid plant.

15+Localities
10.4MWp operating
40+Projects

THE SUN ISour raw material.

Pakistan’s first phase alone could turn it into about 77,500 MWh a year.

Let’s talk about solar for your site in Pakistan.

We would welcome an introductory meeting with industrial zones, manufacturers and public institutions.